How Long Does a Bathroom Renovation Take in Melbourne?

One of the first questions homeowners ask is: “How long will my bathroom renovation actually take?”

The answer depends on the size of your space, the complexity of the design, and how well the project is managed — but here’s what you should realistically expect.

1. Quick Cosmetic Refresh (1–2 Weeks)

If you're only replacing fixtures, painting, or updating tiles — and keeping all plumbing where it is — your renovation could be done in 7–14 days.

Typical scope:
– New vanity, tapware, and mirror
– Fresh paint and new tiling
– No structural or plumbing changes

These updates are great for increasing property value on a budget or preparing a home for sale.

2. Standard Full Bathroom Renovation (3–4 Weeks)

Most Melbourne homeowners are opting for a full renovation — stripping everything out and starting fresh with new layouts, tiles, lighting, and waterproofing.

Typical timeline:
Week 1: Demolition and rough-in (plumbing and electrical)
Week 2: Waterproofing and tiling
Week 3–4: Fixtures, fit-off, final styling and cleaning

Pro tip: The difference between a 3-week and a 6-week renovation often comes down to how tightly managed the trades are.

3. Luxury or Complex Renovations (4–6+ Weeks)

If you're installing custom cabinetry, high-end stone, underfloor heating or relocating major plumbing, the job can take longer — especially if you're waiting on bespoke materials or specialty trades.

Typical delays:
– Custom vanity or joinery lead times
– Special-order tiles or fittings
– Coordinating multiple teams

At Bluestone Build Co., we plan for these from day one so you’re not caught off-guard.

Common Reasons Bathroom Renovations Run Late

Even a simple renovation can drag out if you don’t plan properly. The most common delays we see in Melbourne include:

– Poor project coordination
– Late material deliveries
– Unavailable trades
– Hidden structural issues (like water damage or asbestos)

That’s why we focus on tight scheduling, daily oversight, and proactive updates — so you’re never left guessing.

Need a More Accurate Timeline?

Every home is different. If you want a precise bathroom renovation timeline tailored to your space and budget, book a free consultation and we’ll walk you through it — start to finish.