What Can Go Wrong in a Bathroom Renovation — and How to Avoid It

Let’s be real—bathroom renovations don’t always go to plan.

Tiles show up broken. Waterproofing fails. Trades ghost. You’re left with an unfinished bathroom and a long line of excuses.

At Bluestone Build Co., we’ve taken over projects where things have gone sideways—and it’s always the same handful of problems.

Here’s what can go wrong in a bathroom renovation, and more importantly, how to avoid it.

1. Poor Planning and Rushed Quotes

A rushed bathroom quote that skips the details? That’s your first red flag.

What can go wrong:

  • Blowout in budget mid-build

  • Trades working off assumptions

  • Unclear inclusions (what’s actually being done?)

How to avoid it:
Demand a clear scope of work. Ask for line items. Confirm what’s included, what’s excluded, and how variations are handled. If a builder can’t explain the quote — run.

2. Wrong Builder for the Job

Not all builders are bathroom specialists. Some subcontract everything. Others take on more work than they can handle.

What can go wrong:

  • Lack of quality control

  • Delays from poor coordination

  • No single point of accountability

How to avoid it:
Choose a builder who actually manages the entire renovation — not just a middleman handing off trades. At Bluestone Build Co., we run the show from start to finish.

3. Waterproofing Issues

This one’s a big one—and it can take years to reveal itself.

What can go wrong:

  • Leaks behind walls

  • Rotting floor joists

  • Structural damage

  • Total bathroom rebuild

How to avoid it:
Only use licensed waterproofers. Always request waterproofing certificates. Skimping here is one of the most expensive mistakes you can make.

4. Wrong Tile Choices

Big tiles in tight spaces. Gloss tiles on floors. Poor grout selection. Tiles can make or break a bathroom.

What can go wrong:

  • Slippery surfaces

  • Awkward layouts

  • Visible lippage (uneven edges)

How to avoid it:
Use a builder who helps you choose smart — not just what looks nice in the showroom. And always test samples under your actual bathroom lighting.

5. Hidden Plumbing Problems

Bathrooms can hide all sorts of nasty surprises once walls are open.

What can go wrong:

  • Rusted pipes

  • No proper fall (water pooling)

  • Outdated layouts causing blockages

How to avoid it:
Have your plumber inspect early and build a contingency into your budget for unexpected plumbing issues. Good builders prepare you for this — bad ones blame you later.

6. Delays, Delays, Delays

Sometimes it's product delays. Sometimes it’s trades not showing up. Either way—it adds time and cost.

What can go wrong:

  • Bathroom out of action for weeks

  • Temporary fixes costing you more

  • Project fatigue (yes, it’s a thing)

How to avoid it:
Lock in your build date, order materials early, and work with a team that builds to schedule—not vibes.

Final Thought: Mistakes Are Avoidable

Most renovation mistakes aren’t bad luck. They’re bad planning.

At Bluestone Build Co., we’ve seen where things go wrong—and built a process that avoids it all. Clear scopes. Transparent pricing. Hands-on project management.

If you want your bathroom done right the first time, book your free consult here.

We’ll help you sidestep the headaches—and walk away with a bathroom built to last.