The Journal

What a Complete Kitchen Renovation Scope Should Include

A complete kitchen renovation scope covers planning, demolition, cabinetry, surfaces, appliances, plumbing, electrical work, ventilation, finishes and handover.

Read the guide
In this guide01 / 14

A complete kitchen renovation is more than cabinetry and a benchtop.

The scope should explain how the old room is removed, how the new layout is serviced and how surrounding walls, floors and finishes are left complete.

1. Site review, layout and documentation

Measure the room, investigate accessible structure and services, test appliance doors and circulation, then prepare plans, elevations and a written specification. Identify required approvals and engineering.

2. Protection, isolation and demolition

State floor and access protection, dust controls, service isolation, removal, waste and treatment of adjoining surfaces. Identify hazardous-material assessment or management responsibilities where relevant.

3. Structure and making-good

Include approved wall changes, framing, plaster, levelling and repairs required for the documented design. Concealed conditions should follow an agreed investigation and variation process.

4. Plumbing, electrical and gas work

List sink, dishwasher, refrigerator, cooking, power, lighting and any gas work by exact location and appliance. Include switchboard or circuit work where required, licensed trade responsibilities and certificates.

5. Rangehood and ventilation

Identify the rangehood model, cabinetry interface, duct material, route and outdoor discharge. Coordinate appliance instructions with the applicable NCC ventilation provisions.

6. Cabinetry

Specify carcass, fronts, edges, hardware, internals, panels, fillers, kickboards, handles, installation and appliance integration. Draw awkward corners, tall units and service access.

7. Benchtops and splashbacks

Record product, thickness, edge, joins, cut-outs, support, upstands, splashback extent, templating and installation. Confirm care and fabrication requirements.

8. Appliances and fixtures

Use exact model numbers, supplier responsibility and delivery dates. Include installation components and test that replacement remains possible.

9. Floors, walls, ceiling and paint

State what is retained, patched, replaced or refinished. Resolve flooring beneath cabinetry, transitions, skirtings, cornices and final paint.

10. Programme and management

Include procurement, site supervision, trade coordination, inspections, owner decisions, protection and clean-up. Record the start mechanism, programme assumptions and change process.

11. Testing and handover

Test appliances, fixtures, lights and extraction. Supply manuals, warranties, certificates, product codes and defect records. Consumer Affairs Victoria recommends checking contracted work before final payment.

Before accepting a quote

Compare the proposal against the same drawings and specification. Identify exclusions, allowances, provisional sums and work by others. If an item is not written down, do not assume the total includes it.

Where Bluestone fits

Bluestone coordinates design and construction as one kitchen renovation scope. See complete kitchen renovations in Melbourne.

Official sources used

What would you change
in your kitchen?

Tell us what isn’t working, your suburb and a rough budget. We’ll get in touch to discuss your kitchen.

Discuss my kitchenNo finished plans needed.
View the full Journal
Bluestone Build Co.
01 / 02Your renovation → Your details

Your renovation.

Which rooms? Choose any.
Total renovation budget

A rough idea is fine.

Anything you’d like us to know? Optional
Use the full-page form

Your details are only used for your enquiry.

Privacy choices

Choose what helps Bluestone improve.

These settings control optional website measurement. Essential security and form functions still work.

Checking the privacy default for this visit.

You can change these choices at any time from the footer. Read the privacy policy.